You are here: Our works
   
English
18.01.2018

OUR WORK

The following shows some of the work done by Optima Renovables. Virtually all of our work is customized and designed specifically for each project and it's needs. If you have any questions or would like some advice please don't hesitate to contact us and we will help you find solutions for your particular needs.

  

Portable water treatment in Bescanó

Portable water treatment in Bescanó


Installation of photovoltaic plant H2OPtima in San Martí Vell

Installation of photovoltaic plant H2OPtima in San Martí Vell


50 kW wind turbine in Barcelona

50 kW wind turbine in Barcelona


Solar farm installation in Lleida

Solar farm installation in Lleida


Installation of photovoltaic plant in Seville

Installation of photovoltaic plant in Seville


Installation of photovoltaic plant in Barcelona

Installation of photovoltaic plant in Barcelona


Installation of Solar Farm with fixed structure in Lleida

Installation of Solar Farm with fixed structure in Lleida


Fixed system for photovoltaic panels

Installation of photovoltaic plant in Barcelona


Photovoltaic system that combines fixed plates and solar trackers

Photovoltaic system that combines fixed plates and solar trackers


Installation of photovoltaic plant with Optima-NET

Installation of photovoltaic plant with Optima-NET


Drive mechanism of two-axis solar tracker

Drive mechanism of solar tracker


Installation of photovoltaic plant in Terrassa

Installation of photovoltaic plant in Terrassa


Installation of photovoltaic plant in Terrassa

Installation of photovoltaic plant in Terrassa


Installation of Solar Farm in Lleida

Installation of Solar Farm in Lleida


Installing Solar Farm in Albesa (Lleida)

Installation of Solar Farm in Albesa (Lleida)

 

 

 

 

 

 

Installation of photovoltaic plant H2OPtima in Bescanó (Girona) for the treatment of grey water in the last stage.                                    

 

 

 

 

Installation of photovoltaic plant H2OPtima in San Martí Vell (Girona) for the treatment of water polluted by nitrates.                              

 

 

 

 

Wind turbine with 50 kW of power, 20 meters high and 6 metres of shovel. Installed in the skimmer of the Llobregat (Barcelona).        

 

 

 

 

Solar farm installation of 1200 kw by follower of two axes OPTIM LAND in Maials (Lleida).                                                        

 

 

 

 

Installation of photovoltaic plant with  solar tracker OPTIMTOP on a parking's roof (Sevilla).                                                    

 

 

 

 

 

Installation of photovoltaic plant of 100 kW by follower of ceiling OPTIM TOP in Terrassa (Barcelona).                                                   

 

 

 

 

   

Solar farm installation of 1200 kw by means of structure fixed SUN in the town of Albesa (Lleida).                                                       

 

 

 

 

Installation of photovoltaic plant of 90 kW by means of system of fixed roof SUN ROOF in the town of Terrassa (Barcelona).                  

 

 

 

 

Installation of photovoltaic plant in combination of fixed systems and through monitoring in the town of Terrassa (Barcelona).               

 

 

 

 

Installation of photovoltaic plant by self-supporting fastening system OPTIMANET in covered DECK .1.2 MW.                                 

 

 

 

 

Drive mechanism of two-axis solar tracker with astronomical tracking OPTIM LAND.                                                          

 

 

 

  

Installation of photovoltaic plant of 100 kw by follower of OPTIM TOP roof in the town of Terrassa (Barcelona).                                        

 

 

 

 

Installation of photovoltaic plant of 100 kw by the solar tracking system for rood OPTIM TOP in the town of Terrassa (Barcelona).        

 

 

 

 

Solar farm installation of 1200 kw by solar tracking system of two axes OPTIM LAND in the town of Maials (Lleida).                                

 

 

 

 

Solar farm installation of 1200 kw by structure fixed SUN in the town of Albesa (Lleida).